Navigating the complexities of building permit approval and city regulations can be daunting for both residential and commercial projects. At Reno King General Contractors, our expertise lies in facilitating a seamless process, ensuring timely approvals so your projects can get off the ground without unnecessary delays.
From lot grading and drainage to subdivision planning and civil/municipal roadways, we handle it all precisely. Our engineered plans adhere to strict building code compliance, encompassing electrical and HVAC layout and design. Additionally, our comprehensive approach includes stormwater management and underground water/sewer systems, guaranteeing a holistic solution for all your construction and development needs.
Get in Touch
With a focus on precision and efficiency, we specialize in engineered plans and city approvals for both residential and commercial projects, ensuring compliance from initial grading to final code adherence.
Here is how our expertise protects your project timeline and budget:
We take the stress and confusion out of municipal red tape. Here is how we move your project from a concept to an approved build:
Initial Assessment
We review your project scope, site conditions, and identify exactly which municipal permits and engineered plans are required.
Drafting & Engineering
Our team develops comprehensive, code-compliant blueprints, structural plans, and civil designs tailored to your property.
City Submission
We act as your primary liaison, formally submitting all documentation, grading plans, and permit applications to the city.
Review & Revisions
We handle any questions or requests for modifications from city planners swiftly to prevent bureaucratic bottlenecks.
Final Approval
Once the city issues the green light, we hand over the approved permits so your construction phase can begin immediately.
We proudly provide engineered plans and navigate city approvals for projects in Edmonton (including AB T5S) and surrounding areas, such as:
Sherwood Park
St. Albert
Spruce Grove
Engineered plans are required by the city to prove that your proposed structure or renovation is safe, structurally sound, and complies with the Alberta Building Code. They take into account load-bearing structures, foundational integrity, and complex electrical or HVAC systems.
A lot grading plan ensures that the land is sloped correctly so that surface water (like rain or melting snow) drains away from your building's foundation and doesn't flood neighboring properties. The city requires approved grading plans for most new builds and major additions.
The timeline varies heavily based on the complexity of the project. A simple interior residential permit might take a few weeks, while complex commercial builds, subdivision planning, or secondary suite approvals can take several months. By providing accurate, fully engineered plans upfront, we drastically reduce the city's review time.
Yes. We have extensive experience navigating Edmonton's commercial zoning laws. We guide developers and business owners through complex subdivision planning, civil roadway designs, and commercial building code compliance.
Rejections usually happen due to missing information or code discrepancies. Because we submit highly detailed, code-compliant engineered plans, rejections are rare. However, if the city requests adjustments, we handle the revisions and resubmit the documents promptly on your behalf.
Don't let complex city regulations slow down your build. Reno King Contractors provides the precise engineering and dedicated permit management you need to start construction with confidence.
Contact us today to discuss your project requirements and let us handle the red tape!